
⚙️ The Hidden Work — Plumbing & Electrics (First Fix)
- info535649
- Oct 15
- 3 min read
Once your old bathroom has been stripped out and the space has been inspected, the next stage begins — and it’s one most homeowners never get to see.
The first fix is where your new bathroom’s foundations are built: all the hidden plumbing and electrical work that keeps everything running smoothly for years to come.
At Elite Plumbing & Construction Ltd, we’ve carried out hundreds of professional bathroom refurbishments across Dunstable, Luton, Leighton Buzzard, Bedfordshire, Milton Keynes, Aylesbury, Hemel Hempstead, and Hertfordshire, and this is where our experience and precision really shine.
🔧 Step 1: The Importance of the First Fix
The first fix involves all the behind-the-scenes installation that happens before tiling or fitting any fixtures.
It’s the unseen craftsmanship that ensures your finished bathroom not only looks stunning but performs flawlessly.
During this stage, we:
Replace or re-route existing pipework
Install new hot and cold feeds for basins, showers, and baths
Fit new waste runs and traps
Set up plumbing for towel rails or underfloor heating
Run electrical cables for lighting, mirrors, and shaver sockets
Every element is planned and positioned with millimetre precision — because once your walls are tiled, there’s no going back.
💧 Step 2: Upgrading Old Systems
In many homes, especially older ones, the existing plumbing and wiring simply aren’t suitable for modern installations.
We often find:
Corroded copper pipes restricting water flow
Plastic push-fit systems that aren’t secured correctly
Outdated wiring or junction boxes not up to current standards
When these issues appear, we upgrade them immediately to ensure your new bathroom runs efficiently, safely, and complies with UK Building Regulations (Part P and WRAS).
This protects you from future leaks, electrical faults, or premature wear — saving you time and money in the long run.
⚠️ Step 3: Handling Unforeseen Additional Works
It’s not uncommon to find unexpected challenges once walls and floors are opened up.
Some examples include:
Hidden pipework buried in walls that must be rerouted
Old electrical cables too close to wet zones
Structural timber notched incorrectly by previous installers
When this happens, we stop, assess, and discuss the options with you before proceeding.
We’ll show you photos, explain the issue clearly, and provide a professional solution that keeps your project safe and compliant.
No surprises — just honest, proactive communication.
🧱 Step 4: Setting Out the New Layout
With the hidden work underway, we carefully measure and mark all new fixture positions:
Bath and shower outlets
Basin waste alignment
Toilet waste and pan connector height
Heated towel rail feeds
Electrical switch and lighting placement
This layout stage ensures that everything lines up perfectly once the visible fittings are installed.
Every pipe and cable is positioned with the final design in mind — ensuring precision and symmetry throughout the finished bathroom.
🔌 Step 5: Testing & Sign-Off
Before the walls are closed and tiled, all systems are fully tested:
Water lines are pressure-tested for leaks
Electrical cables are continuity-tested
Drainage flow is confirmed and traps are sealed
Only once everything passes inspection do we move forward to the next phase.
This commitment to testing guarantees that your new bathroom is built to the highest safety and performance standards.
⏱️ Timeframe: The first-fix stage usually takes between 1 and 3 days, depending on the size of the bathroom, layout changes, and any unforeseen upgrades required.
✅ Final Thoughts
The first fix may be hidden once your bathroom is complete, but it’s one of the most crucial stages of the entire refurbishment.
At Elite Plumbing & Construction, our experienced in-house team handles every detail — from pipework to wiring — with the precision and compliance your home deserves.
We don’t take shortcuts, and we don’t compromise on quality. The result is a reliable, high-performance bathroom that looks as good as it functions.
Whether you’re in Dunstable, Luton, Leighton Buzzard, Milton Keynes, Aylesbury, Hemel Hempstead, or anywhere across Bedfordshire, Buckinghamshire, or Hertfordshire, you can trust us to deliver excellence where it matters most — behind the scenes.
🪛 What’s Coming Next
In our next post, we’ll move on to:
👉 “The Foundation — Wall & Floor Preparation.”
We’ll cover how we prepare your bathroom’s surfaces before tiling, including boarding, plastering, waterproofing (tanking), and levelling — explaining why proper prep is the secret to a flawless finish.
Follow us for Part 3 of The Bathroom Installation Process series.
📍 About Elite Plumbing & Construction Ltd
Elite Plumbing & Construction Ltd is a professional refurbishment company based in Dunstable, Bedfordshire, proudly serving:
Dunstable
Luton
Leighton Buzzard
Bedfordshire and surrounding areas
Milton Keynes
Aylesbury
Buckinghamshire and surrounding areas
Hemel Hempstead
Hertfordshire and surrounding areas
We specialise in complete bathroom refurbishments, kitchen renovations, and full property transformations, managing every project in-house from design to completion.
📞 Phone: 07506 079189
📧 Email: info@epacltd.co.uk
🌐 Website: www.epacltd.co.uk
📍 Head Office: Dunstable, Bedfordshire

Comments