top of page
Search

🧱 Day One — Preparation, Protection & Strip-Out

  • info535649
  • Oct 15
  • 3 min read

(Part 1 of “The Bathroom Installation Process” Series)


The first stage of your bathroom refurbishment is where preparation meets precision — and the transformation truly begins.


At Elite Plumbing & Construction Ltd, we’ve completed over 600 bathroom refurbishments across Dunstable, Luton, Leighton Buzzard, Bedfordshire, Milton Keynes, Aylesbury, Hemel Hempstead, and Hertfordshire. Every successful project starts with one core principle: protect the property, assess the existing structure, and prepare the space properly.


Here’s what you can expect during the first stage of your bathroom refurbishment.



🧰 Step 1: Site Protection & Setup


Before any tools come out, our first priority is protecting your home.


Our team will:


  • Cover all access routes with heavy-duty floor protection

  • Seal off the working area using dust sheets and temporary barriers

  • Designate safe material storage and waste removal zones

  • Ensure clean, safe access for both our team and your household


Protecting your property from the start means minimal disruption and a cleaner, safer workspace throughout the project.



🚧 Step 2: Strip-Out — Removing the Old Bathroom


Once the protection is in place, we begin the careful removal of your existing bathroom suite, tiles, flooring, and fittings.


This stage includes:


  • Disconnecting plumbing and isolating electrics

  • Removing old sanitaryware safely and efficiently

  • Stripping wall and floor tiles

  • Preparing waste for responsible disposal or recycling


We don’t just “rip out” — we methodically dismantle. This keeps your home tidy, prevents unnecessary damage, and ensures the area is ready for accurate rebuilding.


All waste is removed and disposed of responsibly in line with UK environmental regulations.


⏱️ Timeframe: This step can take as little as one day or up to three days, depending on what we find once the existing suite and tiles are removed.

Older bathrooms sometimes hide issues like rotten floors, weak stud walls, or damaged plaster, which must be corrected before the next stage can begin.


🧱 Step 3: Assessing the Hidden Structure


Once everything is stripped back, we carry out a thorough inspection of the structure beneath.


We check for:


  • Damp, leaks, or signs of water ingress

  • Subfloor condition and joist strength

  • Stability of wall studwork

  • Pipework and waste positions


This inspection ensures your new bathroom will be built on a solid, safe foundation — not just covered up over old problems.


⚠️ Step 4: Handling Unforeseen Additional Works


Sometimes, during strip-out, we uncover hidden issues that weren’t visible during your initial survey.

Common examples include:


  • Rotten or weakened floorboards from past leaks

  • Damp or crumbling plasterboard

  • Outdated or unsafe electrical wiring

  • Corroded or undersized pipework



When this happens, we pause work, document the issue, and walk you through it before proceeding.


At Elite Plumbing & Construction, we believe in complete transparency — you’ll see clear photos, receive a professional explanation, and be given practical solutions (and costs, if applicable) before any additional work begins.


We never continue without your approval, ensuring every step remains clear, honest, and controlled.



🔧 Step 5: Preparing for the Rebuild


After inspection and any agreed remedial work, we prepare the space for the next stage:


  • Repairing or reinforcing floors and walls if required

  • Re-routing or upgrading plumbing

  • Applying new boarding or underlayment where needed

  • Setting up for first-fix plumbing and electrical work



By the end of this phase, your bathroom will be completely cleared, structurally sound, and ready for the rebuild to begin.


✅ Final Thoughts



This first phase sets the tone for the entire project.

By combining thorough protection, a methodical strip-out, and transparent communication, Elite Plumbing & Construction ensures that every refurbishment begins the right way — safely, cleanly, and professionally.


Whether you’re in Dunstable, Luton, Leighton Buzzard, Aylesbury, Milton Keynes, Hemel Hempstead, or anywhere across Bedfordshire, Buckinghamshire, or Hertfordshire, you’ll always experience the same meticulous Elite standard from day one.





🪛 What’s Coming Next



In our next post, we’ll move on to:


👉 “The Hidden Work — Plumbing & Electrics (First Fix)”


We’ll take you behind the walls and under the floors to explain how we handle new pipework, electrical systems, and all the unseen details that ensure your new bathroom runs perfectly.


Follow us for Part 2 of The Bathroom Installation Process series.





📍 About Elite Plumbing & Construction Ltd



Elite Plumbing & Construction Ltd is a professional refurbishment company based in Dunstable, Bedfordshire, proudly serving:


  • Dunstable

  • Luton

  • Leighton Buzzard

  • Bedfordshire and surrounding areas

  • Milton Keynes

  • Aylesbury

  • Buckinghamshire and surrounding areas

  • Hemel Hempstead

  • Hertfordshire and surrounding areas



We specialise in complete bathroom refurbishments, kitchen renovations, and full property transformations, managing every project in-house from design to completion.



📞 Phone: 07506 079189

📧 Email: info@epacltd.co.uk

🌐 Website: www.epacltd.co.uk

📍 Head Office: Dunstable, Bedfordshire

 
 
 

Recent Posts

See All
🧱 The Foundation — Wall & Floor Preparation

(Part 3 of “The Bathroom Installation Process” Series) Before the tiles go up and the bathroom starts to take shape, there’s one vital stage that determines how long your new bathroom will last — the

 
 
 

Comments


Connect with Us Now!

  • Instagram
  • Facebook

Explore

Opening Hours

Address

Mon - Fri

Sat-Sun

Closed

Burr Street, Dunstable, England, LU6 3AG.

Company No: 13707472

Elite Plumbing & Construction Ltd

07506 079189

This microsite is operated by Elite Plumbing & Construction Ltd and serves customers in the Milton Keynes area.

Visit our main website: epacltd.co.uk

bottom of page